Supply Chain Risk Catalog

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
risk_catalog:application_tab [2015/12/23 10:58]
tina.cvahte@fl.uni-mb.si
risk_catalog:application_tab [2016/01/19 14:15] (current)
tina.cvahte@fl.uni-mb.si
Line 4: Line 4:
   * [[risk_catalog:​model_tab|Model]]   * [[risk_catalog:​model_tab|Model]]
   * [[risk_catalog:​about_tab|About]]   * [[risk_catalog:​about_tab|About]]
 +  * [[risk_catalog:​application_tab|Application]]
 </​WRAP>​ </​WRAP>​
  
Line 11: Line 12:
  
 ====Risk treatment==== ====Risk treatment====
-Consideration of the risks includes selecting one or more appropriate options to change the likelihood of risk, the affect of risk, or both, and to implement those options. This is followed by a cyclic process of re-evaluating risks to re-determine the type of treatment. Risk treatment, which deals with the negative consequences,​ might also be implemented as "risk mitigation",​ "risk elimination"​ and "risk prevention"​. Thus the treatment or modification of risks can be implemented by the removal of a source of threat, by reducing the likelihood of an adverse event, by changing its consequences,​ by risk sharing with the other contractors,​ by cessation of activities, or by maintaining the risk with thoughtful ​decisions. Residual risk is the risk that remains even after Risk treatment.+Consideration of the risks includes selecting one or more appropriate options to change the likelihood of risk, the affect of risk, or both, and to implement those options. This is followed by a cyclic process of re-evaluating risks to re-determine the type of treatment. Risk treatment, which deals with the negative consequences,​ might also be implemented as "risk mitigation",​ "risk elimination"​ and "risk prevention"​. Thus the treatment or modification of risks can be implemented by the removal of a source of threat, by reducing the likelihood of an adverse event, by changing its consequences,​ by risk sharing with other contractors,​ by cessation of activities, or by maintaining the risk with smart decisions. Residual risk is the risk that remains even after Risk treatment.
  
 ====Case study==== ====Case study====
 **On the reverse IRP of collecting hazardous recyclables** **On the reverse IRP of collecting hazardous recyclables**
-mime.local.conf +{{Hazardous_materials_in_transport.pdf}}

Log In